top of page

The Proposals

The Masterplan

The development proposals for the site include the following:

Approximately 61 hectares/ 1.3 million sq.ft. of new logistics development, including a mix of large and small units

A new vehicular access, primarily directing vehicles to the A610 north of the site

A new country park, including enhancement of the River Erewash near the Bennerley Viaduct

Extensive areas of landscaping and biodiversity improvement within the development

Illustrative Masterplan | Bennerley Employment | Harworth Group

Illustrative Masterplan

click to enlarge

1.3million

square feet of new logistics development

10%

biodiversity net gain to be delivered on-site

Estimated

1000

Full Time Equivalent jobs (FTE) once the site is operational

River Erewash Country Park

The landscape strategy for the site will look to retain the existing landscape features on site, whilst also creating a variety of different landscape character areas to create a mosaic of landscape types.

​​

These include:

  • Native tree planting

  • Woodland and shrub planting

  • Areas of grassland

  • Wetland planting to complement
    River Erewash corridor

Proposed Country Park Landscape Masterplan: Option 1 | Bennerley Employment | Harworth Group
Proposed Country Park Landscape Masterplan: Option 2 | Bennerley Employment | Harworth Group
People-in-Green-Space-Park.Ignacio-Brosa.Unsplash.Apr20.jpg
Boardwalk-through-Wetlands_Artem_Pexels_Jul23.jpg
shutterstock_1092993146.jpg
SG1S3171.jpg

The Country Park is also proposed to include running and walking routes, a ‘trim trail’, and benches throughout the site for park users to enjoy.

Woman-Running-Golden-Hour.Tirachard-Kumtanom.Pexels.Mar17.jpg
Blue-Jeans.VisionPic.Pexels.Oct19
catharina-short-sundberg-32X2Iw27LLU-unsplash
West-Gorton-Community-Park
Proposed Access Strategy: Primary Access | Bennerley Employment | Harworth Group
Proposed Access Strategy: Secondary Access | Bennerley Employment | Harworth Group
Proposed Access Strategy: Third Access | Bennerley Employment | Harworth Group

Movement Strategy

Access Strategy

The movement strategy for the site has been carefully considered and developed to ensure that it utilises existing junctions and mitigates congestion and traffic where possible. The current strategy includes 3 vehicular access points, as well as anticipated improvements to cycle and pedestrian access to the proposed employment units and country park areas of the site.

​

Primary Site Access

​A fifth arm onto the existing A6096 Shilo Way/ Gin Close Way roundabout. High quality crossings to be provided to connect with existing shared walking/ cycling facilities.

​

Secondary Site Access

The existing A610 left-in, left-out junction would be retained, providing direct access to the site from the A610.

​

Third Site Access

A third point of access would be provided to serve both the Country Park and the Small Employment Units, with limited HGV access.

Proposed Access Strategy | Bennerley Employment | Harworth Group
Active Movement

These proposals intend to provide a holistic approach to access and movement for vehicle, cycle and pedestrian traffic. This includes proposals to incorporate enhancements to the strong existing pedestrian and cycle connections, particularly between Giltbrook, Awsworth and Ilkeston.

​

Pedestrian Connections

The proposals intend to maintain and, where possible, improve walkable connections to the site. This includes practical improvements proposed to the existing footways and crossing points on the A6069 Shilo Way, as well as recreational paths through the proposed country park. This is proposed to include retention of the existing pedestrian connections where feasible, enhanced pedestrian routes, and running/walking routes such as ParkRun.

​

Cycle Connections

The site is in close proximity to the Erewash Valley Cycle Trail, and offers a strong opportunity to improve the existing cycle connections. With potential to improve cycleways and crossings on the A6069 Shilo Way, as well as connections to recreational routes, this site is well located to support improved active travel connections via bike.

Erewash Valley Cycle Trail/ Erewash Canal Towpath
Sign indicating the footpath under Bennerley Viaduct
IMG_2413.jpg

Drainage

The proposals have been carefully designed around the areas of flood risk associated with the River Erewash. All structures are proposed to be located outside of the areas of highest flood risk. A full assessment of the flood risk affecting the site will be undertaken, to ensure that the proposals will not impact or exacerbate offsite flood risk.

Flood Risk & Drainage Strategy | Bennerley Employment | Harworth Group
DJI_0358-rs.jpg

Surface water will be managed through Sustainable Drainage Systems (SuDS) principles – ensuring that water is attenuated and drained from the site without affecting the wider area. Attenuation basins will provide drainage benefits to the site, whilst encouraging ecological improvements.

IMG_2429.jpg
IMG_5523.jpg

Examples of Sustainable Drainage Systems (SuDS)

bottom of page